快三在线平台

  • <tr id='VlegPy'><strong id='VlegPy'></strong><small id='VlegPy'></small><button id='VlegPy'></button><li id='VlegPy'><noscript id='VlegPy'><big id='VlegPy'></big><dt id='VlegPy'></dt></noscript></li></tr><ol id='VlegPy'><option id='VlegPy'><table id='VlegPy'><blockquote id='VlegPy'><tbody id='VlegPy'></tbody></blockquote></table></option></ol><u id='VlegPy'></u><kbd id='VlegPy'><kbd id='VlegPy'></kbd></kbd>

    <code id='VlegPy'><strong id='VlegPy'></strong></code>

    <fieldset id='VlegPy'></fieldset>
          <span id='VlegPy'></span>

              <ins id='VlegPy'></ins>
              <acronym id='VlegPy'><em id='VlegPy'></em><td id='VlegPy'><div id='VlegPy'></div></td></acronym><address id='VlegPy'><big id='VlegPy'><big id='VlegPy'></big><legend id='VlegPy'></legend></big></address>

              <i id='VlegPy'><div id='VlegPy'><ins id='VlegPy'></ins></div></i>
              <i id='VlegPy'></i>
            1. <dl id='VlegPy'></dl>
              1. <blockquote id='VlegPy'><q id='VlegPy'><noscript id='VlegPy'></noscript><dt id='VlegPy'></dt></q></blockquote><noframes id='VlegPy'><i id='VlegPy'></i>
                Welcome to Dongguan Lisheng Electromechanical Equipment Co., Ltd.

                ? Hotline:400-8385-889
                News

                Hotline:400-8385-889
                Tel:0769-85656916
                Wang:Sheng 13751350708
                Chuang:Sheng 13712951855
                Fax:86-0769-85656926
                E-mail:ls@bmarflies.com
                Website:www.bmarflies.com
                Room 203, No. 45, Lianma Road, Dalingshan Town, Dongguan City  
                Company News
                How does the pipeline layout improve production efficiency?
                Visit:4020 Date:2019-07-11
                The assembly line has a wide range of applications in modern industrial production. It can greatly improve production efficiency, reduce labor costs, and also has the function of integrating production processes. The use of the assembly line has greatly increased the production speed of the product and provided fresh blood for the development of modern industry. So how should the device be laid out? Let's take a look at the following:
                1) Left to right, the best flow in the product (material or piece) is to the right, followed by the backward or forward flow.

                2) The upper process can directly put the materials on the countertop of the lower process. When it is difficult to hand-handle the transfer, the automatic flow tank can be used instead of the “selling” material.

                3) Minimize the amount of special vehicles If the process flow is large, the method of circulating water can be used.

                4) When the equipment layout, do not regard the equipment model as a plane. The site IE needs to consider the position of the nose and the platform and the position of the parking staff.

                5) When the material area is large, the movable table can be used to widen the countertop. It is recommended that the operating table not be too close to the pulley of other equipment.
                6) When using two devices for one person, you can operate as much as possible by turning around to avoid getting up and shifting.

                7) While the equipment is arranged in a smooth flow direction, space utilization should also be considered.

                8) In order to have uniform control of the use of the workshop site, the layout of the equipment is preferably square or rectangular.

                9) The entrance and exit of the piece flow of the unit flow should be placed at the edge of the production line, not in the middle.

                10) The outlet of each unit line of the piece should be close to the center of the table.

                11) Although the equipment layout is required to be compact, the width of the staff seat space must not be less than 55cm.

                12) When the workshop is actually arranged, the ranking staff needs to follow up on site, observe the analysis process or make appropriate adjustments.

                13) In actual production, the workshop management personnel should observe whether the transportation between the various processes is convenient, whether there is a bottleneck, collect and summarize the problems found in the production, further improve the routing method and improve the production efficiency.

                14) With the application of automatic (template) sewing machines in the sewing workshop in recent years, our assembly line also takes into account the off-line layout of such automatic equipment. It is conceivable to operate such automatic sewing machine equipment with raw hands, which reduces labor costs. Under the premise, the sewing efficiency is improved.

                Links
                Dongguan Lisheng Electromechanical Equipment Co., Ltd.    Dongguan Lisheng Electromechanical Equipment Co., Ltd. 
                Home | Assemblyline | 智能分拣吊挂系统 | Products | Successful cases | News | About Us | Contact Us |

                Hotline: 400-8385-889
                Tel:0769-85656916
                Wang:Sheng 13751350708
                Chuang:Sheng 13712951855
                Fax: 86-0769-85656926
                E-mail:ls@bmarflies.com
                Website: www.bmarflies.com
                Add:Room 203, No. 45, Lianma Road, Dalingshan Town, Dongguan City

                Alibaba

                Wechat
                CopyRight ? 2019 Dongguan Lisheng Electromechanical Equipment Co., Ltd. All Right Reserved. 粤ICP备17115331号
                展开
                • QQ咨询

                • 电话咨询

                • 400-8385-889
                QR CODE
                回到顶部